The Future of Brand Standards Review

Goho turns days of manual design standards review into minutes at a fraction of the cost.

Input
Upload floor plans
Facility modules
Lobby
Lounge
Guest room
Gym
Pool
Design review
Lobby review
Lounge review
✓ Guest room review
Gym review
Pool review
Report
Output

Designed for technical services teams at the world's leading hotel brands

Brand names and logos are trademarks of their respective owners and are shown for illustrative purposes only.

From drawing set to report.

Upload your design standards

Goho reads your standards manual and turns every requirement into a check, linked to the clause it came from.

Sample Brand · Fitness amenity standards
Gym12
Changing room18
Pool12
  1. GYM-AREA-BY-SCALEGym minimum area≥ 100 m²
  2. GYM-TREADMILL-REAR-CLEARANCETreadmill rear clearance≥ 1.8 m
  3. CHANGING-LOCKER-FORMULALocker count by room count≥ 18 per changing room
  4. POOL-WATER-SURFACE-AREAPool water surface area≥ 150 m²
  5. POOL-WATER-DEPTH-LIMITSPool water depth limits0.9 m to 1.5 m

42 standards ready to run

Submit the floor plans

Upload the drawings and add a few project details.

New review

1 Drawing

Drop a PDF here Floor plans or drawing packages
Uploading…
Harbourside_Hotel_Floor_Plans.pdf
Full set, 24 sheets, 36.2 MB

2 Project

Reviews run automatically once submitted. Submit for review

Every standard, checked against the drawing

Goho finds each element on the floor plan, checks what it can and flags what it can't. Every result cites its evidence.

Gym · evidence from Level 5 plan
Gym12 Pool12 Changing room18 42 standards
Gym area cropped from the floor plan, showing treadmills, ellipticals and strength stations
  • Gym minimum area≥ 100 m²239.7 m²Passp.7
  • Treadmill quantity≥ 24 foundPassp.7
  • Elliptical trainer quantity≥ 23 foundPassp.7
  • Recumbent bike quantity≥ 1Not identifiableFailp.7

Your reviewer makes the final call

Edit any conclusion, override any status, and watch the summary update instantly before exporting the report.

Reviewer workspace
24Pass
7Fail
11Review
Treadmill rear clearance≥ 1.8 m Rear clearance is not dimensioned. Review
1 change since AI review Export report
  1. Goho reads your standards manual and turns every requirement into a check, linked to the clause it came from.

  2. Upload the drawings and add a few project details.

  3. Goho finds each element on the floor plan, checks what it can and flags what it can't. Every result cites its evidence.

  4. Edit any conclusion, override any status, and watch the summary update instantly before exporting the report.

Technology

Trained for hospitality. Grounded in your standards.

Built for hotels

Our in-house vision and language models are fine-tuned on hotel design standards.

Every finding is sourced

Each result points to the drawing detail or standards clause it relies on.

Your reviewers sign off

AI handles the volume. Your reviewers make the call.

Hospitality first. Every franchisor next.

Every new location has to pass brand review before it opens. Not only hotel brands but other franchisors follow the rule too.

  1. Now

    Hospitality

  2. Next

    Fitness & wellness

  3. Next

    Restaurants

  4. Next

    Retail

See Goho on your own floor plans.

Book a working session and we'll review one of your properties with your team, live.